Staged rollout

Readiness, sandbox, testnet nodes, limited partners, live: what each stage needs.

Approved by the Board for implementation · 20 November 2026

DraftVersion 0.1.0Drafted 11 November 2026Owner: Sovereign Deployment (role being recruited; interim owner to be named, Q4)Licence: [to be confirmed]Side of the line: published

A draft (0.x): read it, build to it and comment on it; it may change without notice. Drawn from the Sovereign Continuity Stack page. Changelog · Comment on this specification

Relies on: Correspondence proof format, C-Gate decision format (planned), Audit method · Relied on by: Sovereign Stack runtime interface (planned)

1 Purpose

Every CRIS release, and every sovereign deployment, moves forward one stage at a time. This specification sets out the stages and what each gate between them needs.

2 The stages

StageWhat happensExit needs
1 ReadinessThe readiness checklist is completed and agreements are signedA local accountable person named
2 SandboxThe loop runs in isolation, with no real people or dataThe sandbox’s correspondence proofs, a C-Gate decision and a tested rollback
3 Testnet nodesThe loop runs on testnet infrastructure under a written agreement, still without live personal dataAs above, plus the local partner’s approval
4 Limited partnersA small number of named institutions use it, monitored, under their own agreementsAs above
5 LiveGeneral use, under local controlAn independent audit first

3 Rules

  1. Each move forward needs the previous stage’s correspondence proofs, a C-Gate decision, a tested rollback and the local partner’s approval.
  2. A failure sends the deployment back one stage.
  3. No partner receives a stack that has not passed an external audit.
  4. No stage names a country, ministry or partner in public until an agreement is signed and publication is approved.

See the Deploy path for the documents each stage uses and the hosting options.

4 Changelog

  • 0.1.0 · 11 November 2026 · minor · First draft, from the Sovereign Continuity Stack page.

Printed from the developer hub changelog, the one record of every version.

Owner: Sovereign DeploymentNext review: 2027-05-11